Site Remediation Services in Western Australia | Peel Resource Recovery

Expert Contaminated Site Remediation for Safe and Sustainable Solutions

Peel Resource Recovery (PRR) is a recognised industry leader in contaminated site remediation, with extensive experience remediating polluted industrial, manufacturing, and mine sites across Western Australia. Our approach is grounded in a comprehensive understanding of the environmental and occupational health and safety (OHS) regulatory landscape, legislated through State and Territory frameworks. PRR’s remediation strategies are designed to address complex contamination challenges, including asbestos-impacted soil and other hazardous materials.

Call us:(08) 9531 3111
Asbestos Removal
Holding a Class B Asbestos Removal License (WR1362), we can handle asbestos-contaminated soil remediation, ensuring environmental safety.
Hydrocarbon Contamination
We manage and recycle hydrocarbon-contaminated soils using appropriate methods to minimize environmental impact.

Soil and Waste Classification
Soil testing and waste classification in accordance with safe waste management protocols.
Capping and Stabilization
Implementing contamination control methods like capping and soil stabilization to prevent future exposure.
1. Why Site Remediation is Essential? 2, When Remediation is Required?

Navigating WA’s Regulatory Framework for Contaminated Land

Site remediation is essential in Western Australia due to the significant environmental and health risks posed by industrial, mining, and agricultural activities. Contaminated sites can negatively impact ecosystems, soil, groundwater, and public health, which is why remediation is necessary to prevent long-term damage. WA’s environmental regulations, including the Contaminated Sites Act 2003 and the Environmental Protection Act 1986, require industries to manage and rehabilitate polluted land to ensure compliance and protect the environment. Remediation also allows for the safe reuse or redevelopment of land, whether for housing, industry, or public spaces, adding value and supporting sustainable development. For the mining industry, rehabilitation is a legal obligation to restore land after mining operations, reducing long-term environmental liabilities. In addition, proper site remediation helps businesses maintain their social license to operate, build community trust, and meet sustainability goals, ensuring they can continue their operations with the support of local communities and regulatory bodies.

With Peel Resource, you can establish a comprehensive site remediation system from A-Z, ensuring that your projects are completed efficiently and safely while maximizing both environmental sustainability and profitability..

When is Site Remediation Required?

1. Pre-Development Remediation

Former industrial and mining sites often contain hazardous substances such as heavy metals (lead, arsenic), hydrocarbons (fuels, oils), and asbestos from past operations, and construction activities during redevelopment can disturb contaminated soil, releasing toxins into the air or groundwater, which requires assessment and remediation under WA’s Contaminated Sites Act 2003 before rezoning or redevelopment can proceed.

2. During-Development Remediation

During development, construction activities might uncover additional contamination that wasn’t identified in the initial assessment. This phase addresses any new contamination sources, ensuring that soil or water remains uncontaminated while the site is being developed. It’s necessary to manage and contain any pollutants that might be disturbed during excavation, demolition, or construction. Continuous monitoring and appropriate handling of materials are key to preventing health risks to workers and the surrounding community.

3. Post-Demolition Remediation

Buildings constructed pre-1990 are likely to contain asbestos-containing materials (ACM), and demolition of such structures can release dangerous airborne fibres, with strict regulations under the WA Work Health and Safety Act 2020 mandating safe ACM removal before demolition, as untreated ACM debris can contaminate soil and make future development hazardous.

Experience and Expertise

With over 50 years in the industry, we have handled various types of soil contamination in large projects across Western Australia.

Regulatory Compliance

With 50+ years servicing Perth, Peel & Southwest WA, our in-house fleet of excavators, dump trucks, and screening plants delivers DWER-accredited (License L7060/1997/13) remediation solutions. We adhere to all relevant regulations, including the Waste Avoidance and Resource Recovery Act and hazardous waste disposal guidelines.

Cutting-edge Technology:

We utilize the latest technologies for handling and disposal of contaminated soil, including methods such as in-situ treatment, excavation and disposal, and containment

Risk Management

Each project is managed with attention to health and safety, including air quality monitoring and dust control throughout the remediation process.

industries support

Our site remediation services are delivered with a strong focus on:

Strategic Planning
Detailed site characterisation and remediation planning based on contaminant type, extent, and environmental context.
Risk Management
Implementation of site-specific safety protocols and dust suppression systems to control airborne hazards such as asbestos fibres.
Regulatory Compliance
Adherence to all applicable environmental and workplace health legislation, including EPA and Department of Health guidelines.
Safe Work Practices
Deployment of trained and certified personnel, use of enclosed plant and machinery with HEPA filtration, and rigorous air monitoring conducted by third-party occupational hygienists.
Sustainable Outcomes
Where possible, we recover and reuse soil and materials post-remediation, ensuring they meet environmental clearance criteria.
x

Discover how Peel Resource Recovery’s comprehensive services and extensive expertise can add value to your next project.

Address Business
49 Munday Avenue Pinjarra WA
Contact With Us
(08) 9531 3111
(08) 9531 3444
Working Time
Mon - Sat: 8.00am - 18.00pm
Holiday : Closed
x

Contact With Us!

2220 Plymouth Rd #302, Hopkins, Minnesota(MN), 55305

Call us: (234) 109-6666

Mon – Sat: 8.00am – 18.00pm / Holiday : Closed